1st to clear the old driveway rock and bank it below for later use.


Next to flip/buildup and compact dirt for a pool pad to be dug at some later date. Actually the pool deck level drops it below the level of the old wall footing. There's going to be a serious bit of rebar and concrete to shore that up. I've estimated as much as 15yds of concrete in just that footing. Cha-ching! From the initial grading so far it's looking like maybe I estimated high. Here's hoping...