Moving day #2 & 3


Finished rolling out pool pad, including elevated pad at one end for deck and hot tub. Got started cutting down at top back of the lot to form a pad for new shop and RV parking.




Well lookie there. Found the sewer line. Duh-ohhh! Actually that was anticipated. It was a matter of if -- not when.

"HEY GIRLS! Get out of the bathroom." Still to be patched up today before I head back up to where the rest of the family is camping. That'll be temporary. The tight line will have to be redug and relocated hard up against the fence line in the next week or so.

Check out that transition! It's going to be about 30 steps down to shop floor from our upper yard. I see a retaining wall and stair/deck framing wall project.